Medium frequency inverter spot projection welding machine is a set of advanced welding equipment. Widely used, welding transformers have a small volume and large output energy. The advantages of portable spot welding machines used in the automotive industry are even more evident. Its superior performance is due to the increase in the frequency of its welding transformer from 50/60Hz to 1000Hz, which greatly reduces the weight of the iron core material. In addition, the rectifier diode in the secondary circuit of the transformer converts electrical energy into DC power for welding. This can greatly improve the value of the secondary circuit inductance coefficient, which is an important factor leading to energy loss and can almost be ignored in DC welding circuits, thereby minimizing production costs.
Main Features
Compared with ordinary AC resistance welding machines, it has the following advantages:
1. Energy saving: Compared to using low frequency, it can reduce the consumption of electric energy. A transformer with the same weight can output more energy, which can be easily used with large automatic welding tongs. Suitable for welding thick workpieces and highly conductive metals. Such as aluminum and all galvanized steel plates. Generally speaking, small and lightweight systems can accelerate movement and shorten work cycles, making them the best matching solution for welding machines/robots.
2. Improve power factor and reduce production costs.
3. Interference can be reduced in the secondary circuit with a large opening area: the welding current is DC, and when there is inductive/magnetic material in the secondary winding, it will not affect welding.4. Balance the load of power supply equipment: The intermediate frequency inverter spot projection welding machine uses three-phase power supply and can store energy.5. Greater adaptability to grid fluctuations and voltage drops: A portion of energy is stored by the inverter and then fed to the load, replacing the method of directly supplying power to the load from the grid.6. More accurate and fast current control: More and more accurate analysis of parameters compared to low-frequency systems.7.Faster reaching the set current: The intermediate frequency can adjust the welding current 20 times faster than traditional technology.8. More reliable process: DC welding is better for most metals that apply resistance welding.9. Intermediate frequency systems are generally more reliable than traditional technologies and can avoid some damage that can lead to damage to thyristor based systems.10. Reduce operating costs, including saving welding energy at each point and shortening the welding cycle.
Technical Parameters
Item/Models
DN2-60X
DN2-60C
DN2-80X
DN2-80C
DN2-100X
DN2-100C
Power at 50% (KVA)
60
60
80
80
100
100
Maximum short circuit current (KA)
10
10
12
12
14
14
Secondary unload voltage (V)
8.9
8.9
8.9
8.9
8.9
8.9
Voltage at 50Hz/60Hz (V)
3φ380
3φ380
3φ380
3φ380
3φ380
3φ380
Distance between the arms (mm)
120-280
100-300
120-280
100-300
120-280
100-300
Max. strength at electrodes (N)
3500
3500
3500
3500
3500
3500
Working stroke (mm)
15-45
15-25
15-45
15-25
15-45
15-25
Max. stroke (mm)
50-120
60/100/140
50-120
60/100/140
50-120
60/100/140
Arm length (mm)
240-500
200-500
240-600
200-500
240-600
200-500
Compressed air supply (MPa)
0.5
0.5
0.5
0.5
0.5
0.5
Max.thickness of mild steel sheet with min. length s arm (mm)
3+3
3+3
4+4
4 +4
5+5
5+5
Max Welding thickness With 500mm arms (mm)
2+2
2+2
3+3
3+3
3+3
3+3
With maximum length arms (mm)
1.2+2
1.2+1.2
2+2
1.8+1.8
2.0+2.0
2.0+2.0
Cross wire maximum (mm)
14+14
14+14
16+16
16+16
20+20
20+20
Cooling water pressure drop (MPa)
0.05
0.05
0.05
0.05
0.05
0.05
Cooling water flow (L/min)
8
8
8
8
8
8
General Stuctures
Different Styles
Winning by quality, precision to thrive! More details, please contact!
Use & Installation
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 23 Jan, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.