From the milk reception,pasteurization,standardization,concentration,drying to aseptic filling and packaging,Triowin can provide total solution for pasteurized milk,ESL milk,UHT milk,yogurt&fermented products,milk based drinks,recombined milk,soymilk,vegetable protein milk,condensed milk,cream,non dairy cream,butter,butter oil,milk powder,infant milk powder,cheese,ice cream processing and packaging.
Raw material
Liquid cow milk, goat milk, camel milk, milk powder dissolving with water
Product
Pasteurized milk, yogurt, flavored milk, milk drink, sour milk, butter, cheese and so on.
Capacity
100L-300T/D
Product package
Aseptic pouch, gable top box, plastic bottle, plastic cup, glass bottle, plastic pouch, bulk, according to customer's requirement
Service include
Turnkey project service: design, manufacture, installation, commissioning, training, after-sale service and so on.
2.Dairy milk/condensed milk / milk powder processing machinery plant include
1. Milk Reception or Powder Dissolving Mixing Section 2. Mixing and Sugar Melting Section3. Pasteurizer and Homogenizer4. Milk Storage or Yogurt Producing Unit5. Filling or Packing Unit6. CIP Cleaning Systems7. After Treatment Equipment, like conveyor, package or pallet, etc.8. There are other assistant equipments used such as steam boilers, air compressor, cold water unit, etc.9. Installation materials for the material pipeline, non-material pipeline as well as electrical installation are provided
3.We provide
Semi-Automatic PET Bottle Blowing Machine Bottle Making Machine Bottle Moulding MachinePET Bottle Making Machine is suitable for producing PET plastic containers and bottles in all shapes.
Milk Processing Line
No.
Name
Main Technology Parameters
1
Milk Receive/Storage and Cream Separator Unit
2
electron pound scale
maximum weighing 500KG
3
milk weighing tank
made of SUS stainless steel, single layer, product feeded in through 40 mesh filter net, CIP cleaning ball
4
milk acceptor
SUS304 stainless steel, single layer, CIP cleaning ball
SUS304 stainless steel, stainless steel filter element 100 mesh
17
Sterilizing, homogenizing unit
18
UHT sterilizer
tube type, sterilizing temperature 137ºC, holding time 4s, fully automatic control
19
high pressure homogenizer
40MPa,(starting box included)
20
temperature holding
SUS304, holding 300S
21
distributing plate
SUS304, 3 holes
22
concentration unit
23
spray dryer
24
packing line
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 23 Jan, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.