1.Automatic with Alarm:The pressure in all tank and the liquid level of the machine are all controlled automatically with PLC.Once a error occurs,the alarm lamp will light and the alarm ring will sound and the mixer will stop automatically. 2.Easy operation and regulation:The operation of the mixer is especially convenient.Only turn around the buttons according to the pre-set program,the normal operation can be carried out.The production capacity,water-sugar proportion and gas content can be adjusted without exchanging and parts. 3.Even mixing and accurate proportion:One time mixing process is adopted,so the mixture is even.The mixing proportion of water and sugar is strictly controlled with measuring needle valve with fine regulation.Its precision can reach about 5%. 4.Enough gas content:The mixer adopts vacuum desoxidation technology at normal temperature.Its desoxidation ratio reaches above 90%.It has a baffle heat exchanger to cool the sugar-water mixture and carry out twice carbonating, so its carbon content is especially high.
Heat plate exchanger
The beverage pump extracts the raw liquid into the temporary storage tank, pressurizes the liquid in the tank to the plate heat exchanger through the high pressure pump for cooling, then mixes with the carbon dioxide gas, and finally enters another storage tank for secondary mixing, increasing the mixing effect, so that the carbonated beverage is completed and the stainless steel pipe is connected to the filling machine. Function: Carbonated drink inlet and out and cooling water inlet and outlet.
Online concentration analyzer
Based on the principle of light refraction, it is widely used in the online concentration of solution in food, pharmaceutical, biochemical and mechanical processing industries. Automatic detection and control, can be viewed and set through the concentration analyzer display panel and mobile phone Bluetooth connected APP software. Various parameters, with switching control signal output.
Carbonation tank
304/316 Stainless steel balanced pressure tank.Mixing uniformity, the proportion is accurate: Use flow meter to control liquid and CO2 ratio. The structure is healthy and easy to clean The machine adopts a closed system made by stainless steel and has the CIP flavor cleaning equipment to clean the equipment and pipeline by the liquid antiseptic and hot water, and then to ensure the beverage made by the machine can meet the health requirements.
Proportional valve
The proportional valve precisely controls the ratio of sugar and water in the mixer equipment, reducing the risk of error and allowing the product to achieve the highest mixing effect.
Flow meter
In the beverage industry, high-precision mass flow meter ensure precise proportional metering processes and results for sugar and water ingredients.
Main technical parameter
Model
QHS-8000
QHS-2500
QHS-5000
QHS-8000
QHS-10000
QHS-12000
Production capacity (t/h)
8T/H
2000-3000
4000-5000
8000-9000
10000-12000
12000-14000
Mixing ratio range
1:3—1:7
CO2 content(CO₂ and H₂O volume ratio)
3.8-4.2
Finished drink temperature
<4°
Semi-finished water and material temperature
4°-15°
CO2 consumption
About 350-450L/m
Finished drink pressure
0.2-0.3MPa
3.5kw
5.5kw
7.5kw
8.2kw
11kw
Finished drink outlet material pressure
0.3-0.6MPa
2.8*1.9m
3.2*2.2m
3.4*2.5m
4.8*2.3m
5.5*3.3m
Weight
4000kg
2.5m
2.5m
2.5m
2.5m
2.5m
Power
26kw
1500kg
2000kg
3500kg
5000kg
6000kg
Dimension
4200*2300*2400mm
Voltage
380V 50HZ 3P or customize
Material
Tank thickness: 3mm, with heat preservation, SUS304
Main configuration:
NO.
Name
Brand
Country
1
Mixing pump
CNP
China
2
PLC
INOVANCE
China
3
Frequency changer
INOVANCE
China
4
Discharge pump
MATLONG
China
5
MATLONG
ATAGO
Japan
6
Proportional valve 2pcs
Yuan An
China
7
Flow meter 2pcs
Emerson
USA
8
Pressure sensor
Xuan sheng
China
9
Switch element
Schneider
French
10
Intake proportional valve
Shen ji
China
11
Heat plate exchanger
Purson
China
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 23 Jan, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.