π Important:
All orders, emails, and quotations will be processed and responded to once we reopen on 3rd January 2025.
Thank you for your understanding and patience!
π Festive Closing Notice:
We will be closed from 21st December 2024 to 3rd January 2025.
Wishing you a joyous holiday season! π
Pasteurized milk: milk processed by pasteurization is characterized by low temperature sterilization at 72-85 β. It can kill harmful bacteria in milk and preserve nutrients and pure taste.
UHT milk: The milk processed by UHT production line can be stored for a long time without deterioration, and the milk quality is stable without refrigeration. It can be used with aseptic filling machine.
Production line introduction:After centrifugation, standardization, homogenization, sterilization and cooling, the milk can be directly filled after pasteurization and homogenization without any additives. Due to low temperature sterilization, the beneficial bacteria in milk can be retained, and the nutritional value is particularly high. Moreover, the cost of the equipment is low and the package is simple.
Pasteurized milk is a kind of "low temperature pasteurized milk". The harmful microorganisms in raw milk have been generally killed, but some other microorganisms will be retained. Therefore, this kind of milk is required to be refrigerated at about 4 β in transportation, sales, storage and other links, so as to prevent the microorganisms in it from "active". glass bottles, etc.
Model
Power
Stirring motor power
Weight
Tank size
300L
9kw*2
0.37kw
120kg
850*750mm
500L
12kw*2
0.37kw
220kg
1000*850mm
800L
15kw*2
0.75kw
320kg
1100*850mm
1000L
12kw*4
0.75kw
380kg
1200*900mm
Product Details
Product Display
Duplex filter
The duplex filter is composed of two stainless steel filters in parallel, which are mainly used to filter the cattle hair and impurities mixed in the milking process. The two filters can work independently without affecting the production.
Preheating tank
The function of the milk preheating tank is to heat the raw milk to about 60 Β° C and serve the homogenization of the next process, because the homogenization effect of milk at about 60 Β° C is good.
Homogenizer
The homogenizer is used to crush and refine the macromolecular fat protein globules in the milk under the action of extrusion and strong impact, and evenly disperse them in the milk to make the milk smooth and taste good. Make the yogurt fermented well in the later stage.
Sterilization tank
Milk processed by pasteurization is characterized by sterilization at 72-85 β, which can sterilize harmful bacteria in milk and preserve nutrients and taste.
Fermentation tank
The appropriate temperature for yoghurt fermentation is about 43 Β° C. After fermentation, the fatty acid in the milk is twice as much as that in the raw milk, and the nutrition is easier to be absorbed by the human body.
Refrigeration tank
The precooling tank can greatly improve the production line capacity, cool the sterilized milk, not affect the sterilization work of the sterilization tank, and save power and water consumption.
CIP cleaning system
CIP automatic cleaning can save labor and is mainly applicable to medium and large production lines. The C | P cleaning system is composed of three tanks: acid water tank, alkali water tank and clean water tank. Clean the equipment by circulating three kinds of liquids respectively.
Our strengths:
*It can be designed according to the special requirements of users
*Multiple products can be produced on the same production line
*It can produce high quality products and keep nutrients
*Aromatic substances can be added and mixed precisely
*Extend the shelf life of products*Large output and small loss
*Application of high technology to save energy consumption
*According to the customer's choice, we can provide a variety of milk configuration.
Applicable Scope
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 23 Feb, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.