Sandblaster
Sand blasting machine Application:
Sandblasting machine widely used in ships, Bridges, mining, machinery, oil pipelines, machine tools, railway, metallurgy,
boiler,machinery manufacturing, port construction, water conservancy projects such as surface derusting, smooth surface.It is the
most widely used product of abrasive jet, and the sandblasting machine is generally divided into two categories: dry sandblasting
machine and liquid sandblasting machine.
In order to ensure the correct and stable use of Junda machine, it is very important to understand the equipment in detail. The following is introduced on its working principle diagram.There are dry and wet blasters. Dry sand blaster can be divided into suction type and road type .A complete dry suction blaster is generally composed of six systems: structural system, medium power system, pipeline system, dust removal system, control system and auxiliary system.Dry suction sand blasting machine is powered by compressed air, through the high speed movement of air flow in the negative pressure formed in the spray gun, the abrasive through the sand pipe. Suction spray gun and through the nozzle injection, spraying to be processed surface to achieve the desired processing purpose. Working principle of press-in dry sand blasting machine: it is powered by compressed air. Through the working pressure established by the compressed air in the pressure tank, the abrasive passes the sand valve, is pressed into the sand pipe and shot through the nozzle, and sprayed to the processed surface for the expected processing objectives.
Model JD-600 | JD-600D/W | JD-700D/W | JD-800D/W | JD-1000D/W |
Diameter | 600mm | 700mm | 800mm | 1000mm |
Height | 1450mm | 1650mm | 1800mm | 2000mm |
Capacity | 0.3m³ | 0.4m³ | 0.6m³ | 1m³ |
Efficiency | 5-10m2/h | 6-10m2/h | 10-12m2/h | 10-30m2/h |
Pressure | 7Mpa | 7Mpa | 8Mpa | 8Mpa |
Air Consumption | 3.6m³/min | 3.6m³/min | 3.6m³/min | 3.6m³/min |
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.