B21, China Town Mall, Midrand
Welcome to Afrimart OnlineWrap new offers/gift every single day on Weekends.New Coupon Code: Fast024
Something you love is now on sale! Buy Now !
Wastewater Sewage System Waste Water Treatment Plant

0 Customer Reviews

  • Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 03 Feb, 2026, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
  • Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
  • Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
  • Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
1. What types of wastewater can this treatment plant handle?

The Wastewater Sewage System can handle various types of wastewater including plastic recycling line sewage, domestic sewage, factory sewage, and school sewage.

2. What is the capacity of the treatment plant?

The treatment plant comes in different models with capacities ranging from 5 tons per hour (WT-5) to 20 tons per hour (WT-20).

3. How many workers are required to operate the system?

The number of workers required varies by model: 1-2 workers for WT-5 and WT-10, 2-3 workers for WT-15, and 3-4 workers for WT-20.

4. What is included in the main machine of the treatment plant?

The main machine includes wastewater adjust pond, reaction tank, air flotation tank, separation water tank, sand filter tower, carbon filter tower, sludge tank, and plate frame filter press.

5. How does the chemical feeding system work?

The chemical feeding system consists of three PE barrels filled with reaction materials, each with its own pump. The pH of the water is automatically adjusted for optimal reaction.

6. What materials are used in the construction of the tanks?

The tanks, including the air floating tank and filter tanks, are made of stainless steel, ensuring durability and resistance to corrosion.

7. What is the purpose of the air flotation tank?

The air flotation tank is used for solid-liquid separation, utilizing a dissolved air pump and tower to effectively separate solids from the liquid water.

8. How is sludge managed in this system?

Sludge is collected in the sludge tank and then processed using a plate and frame filter press, which separates it into dry and liquid forms for easier handling.

9. Can the treated water be reused?

Yes, after the treatment process, the water can either be drained out or reused, depending on the specific needs and regulations.

10. What power requirements are needed for the system?

The running power varies by model, ranging from 13 kW for the WT-5 model to 26 kW for the WT-20 model.

11. What are the dimensions of the treatment plant models?

The dimensions vary by model: WT-5 measures 11*6*5m, WT-10 measures 13*6*5m, WT-15 measures 16*7*5m, and WT-20 measures 19*7*5m.

12. Is training provided for operating the treatment plant?

Yes, training can be provided to ensure that staff are fully equipped to operate the treatment plant effectively and safely.

13. What kind of maintenance does the plant require?

Regular maintenance includes checking chemical levels, cleaning filters, inspecting pumps, and monitoring the overall system performance.

14. What safety measures are in place for handling chemicals?

The plant is designed with safety features including automatic chemical feeding systems and proper containment to ensure safe handling of chemicals.

15. How long does the treatment process take?

The treatment process duration can vary based on the type of wastewater and the specific system configuration, but it is designed to be efficient and fast.

0

0 Overall Rating
  • 5
    0%
    0
  • 4
    0%
    0
  • 3
    0%
    0
  • 2
    0%
    0
  • 1
    0%
    0

Review this product

For you to write a review, you need to login first

Login

Latest Order Arrivals

Discover our latest orders

12 Heads Embroidery Machine
12 Heads Embroidery Machine
Dewatering Pump Machine
Dewatering Pump Machine
Order Collection
Order Collection
Portable Water Drilling Rig
Portable Water Drilling Rig
Order Usefully Collected
Order Usefully Collected
Batch of Orders
Batch of Orders
Agriculture Processing Machines
Agriculture Processing Machines
Meat Grinder Machine
Meat Grinder Machine
Water Pump Equipment
Water Pump Equipment
Packaging Machine and accessories
Packaging Machine and accessories
Fabrics Manufacturing Equipment
Fabrics Manufacturing Equipment
Mining Equipments
Mining Equipments
Food Processing Machine
Food Processing Machine
Batch of Orders
Batch of Orders
Batch of Orders
Batch of Orders
Latest Orders Labelled
Latest Orders Labelled
wheel alignment machines
wheel alignment machines
new arrivals
new arrivals
Pre Orders Offloading
Pre Orders Offloading
Latest Arrivals
Latest Arrivals
Latest Arrivals
Latest Arrivals
Latest Arrivals
Latest Arrivals

Related Products

Recently Viewed Products