Valve seat boring machine TL120DRO offers the patented new Triple Air-Float Automatic Centering system and its high torque and powerful motorspindle. Very accurate, all-purpose machine to cut valve seats and ream valve guides. Extremely versatile this machine will cut valve seats from the smallest to the biggest diameter. Thanks to its lightweight floating system. It will machine cylinder heads of any size from micro-engines up to big stationary engines. Featuring a machine bed structure optimized by static and dynamic calculation, with a modern, modular and functional design, it can accommodate either the tilting fixture (+42deg to -15deg) or the hydraulic 360deg roll-over fixture with lateral up-and-down system.The TL120 Power has a benefit of air floating table bars. Thus adding faster setup time and effortless shifting of any size cylinder head. This feature decreases operator fatigue and increases productivity.*Machining capacity 0.55"/16mm to7.25"/120mm. *Fitted with the new tooling that decreases the cutting force by 30%, this machine will cut the hardest seats. *Patented lightweight workhead: built-in spindle motor and triple air-float automatic entering system. Minimal workhead inertia and maximal floatation for unmatched centering sensitivity.*Build-In spindle motor. Broad torque ratings from lowest RPM.*Fully integrated spindle motor: Infinitely variable spindle speed, 0 to 1000r.p.m., with sensorless Vector Flux Control in open loop (extremely broad torque ratings from lowest r.p.m.). Digital spindle rotation read out.
Product Paramenters
Machine Space requirements
MODEL
TL120DRO
Length
Unlimited
Width
Mm/inch
500/19.7
Height
Mm/inch
450/17.7
Crosswise work piece tilting
Degrees
+45~-15
Cross travel of worktable
mm
160
Machining capacity
mm
16-120
inch
0.63-4.72
Work head displacement
Lengthwise
Mm/inch
990/39
Crosswise
Mm/inch
40/1.6
Sphere cylinder travel
Mm/inch
9/0.4
Spindle
Max. spindle inclination
Degrees
5
Spindle travel
Mm/inch
200/8
Spindle motor power
Kw
2.2
Spindle rotation
Rpm
0-1000
Power supply
380V/50Hz 3Ph OR 220V/60Hz 3Ph
Air flow
Bar/psi
6/87
Max. air
1/min/cfm
300/11
Level of noise at 400rpm
Dba
72
At 1200rpm
dba
82
N W/G W
Kg/1bs
1500/3300
Machine Space requirements
Length
Mm/inch
1750/68.9
Width
Mm/inch
1150/45.3
Height
Mm/inch
2200/86.6
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 15 Feb, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.