Tunnel Drilling and Blasting Excavation Equipment ZYS113 Tunnel Drilling Jumbo for railway, highway and water conservancy
Product Overview
Product Features
ZYS series rock drilling rigs are tunnel drilling and blasting excavation equipment, which can be widely used in various tunnels in railway, highway, water conservancy, metallurgy and other fields, as well as excavation and support operations in the construction of wells and culverts.
Intelligent precise positioning The equipment realizes the precise positioning of the rock drilling rig in the tunnel by using an integrated positioning and scanning device.
High quality and efficient drilling The equipment uses the blasting design drawing to import into the computer, and it can realize automatic drilling without the need for drawing points on the tunnel face. The parameters such as the angle, position and depth of the drilling are controlled by the computer of the equipment, and the drilling is accurate. The rock drill of this equipment has high power and fast drilling speed, and the fastest speed can reach 3~5m/min.
Advanced geological analysis The equipment monitors and collects parameters such as drilling pressure, drilling speed and drill pipe rotation speed in real time, and analyzes the geological conditions through the MWD software to optimize the blasting plan.
3D Contour Scan The device's scanner measures the inner surface profile of the blasted tunnel to form a "point cloud". Then the computer reconstructs the 3D contour, obtains data such as over and under excavation, and finally guides the optimization of blasting design after comparing the actual contour with the design contour value.
Good work environment The equipment is equipped with a fully enclosed cab, built-in operating air conditioner and driving air conditioner; at the same time, the noise in the cab is lower than 78dB, and the dust is low, which effectively reduces the occurrence of occupational diseases.
High degree of informatization The equipment has the function of automatic recording and storage of borehole logs, which provides a theoretical basis for the later geological analysis of the tunnel. The equipment has the function of automatically recording and storing 3D scan logs, which can be used to check the over-excavation and under-excavation, and can also calculate the amount of earth and stone for over-excavation and under-excavation. The equipment can be monitored remotely through the network, and the animation of the motion trajectory of the jumbo in any period of time can be generated. The equipment can view the value of each instrument of the jumbo in real time.
Strong adaptability The equipment can be used for full-section (including inverted arch), large-section, micro-step method and other excavation methods; The equipment can be used for hole operation and pipe shed operation in the hole. The equipment is equipped with automatic rod connecting device, which can realize advanced drilling.
Plateau Adaptation (Only Plateau Type Available) The equipment has a high-altitude environment adaptability design and can work efficiently in an environment with an altitude of ≤ 4500m and a temperature of -25~50°.
Add: Suite 2806, Super Ocean Finance Center, No.2067 West Yan'an Road, Shanghai 200336, China.
PRODUCT SPECIFICATIONS
Item
Unit
ZYS134
ZYS134G
ZYS113
ZYS113G
ZYS82
ZYS82G
(Four-boom)
(Four-boom)
(Three-boom)
(Three-boom)
(Two-boom)
(Two-boom)
Machine weight
kg
71000
52000
33000
Overall size: length*width*height
mm
18200×3100×3800
17600×2900×3600
15100×2500×3300
Total electrical power
kW
380.5
325
215
Maximum working section: width*height
m
17.8×13.4
16.6×11.3
13.2×8
Minimum working section: width*height
m
7×7
6×6
4×4
Maximum gradeability
%
25
Minimum turning radius
m
12.6
12.4
8.6
Rock drill model
/
4×HC110
3×HC110
2×HC110
Rock drill power
kW
27
Maximum drilling depth
m
5.25
4
Drilling diameter
mm
φ41~φ140
Cable length
m
100
Water pipe length
m
100
Initial water pressure
bar
1~10
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 14 Feb, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.