Quantity | Price |
---|
Product Description
The gummy candy line was specially innovated by our R&D department according to the market, which can produce gummywith multiple shapes and variety colors on base of advanced technology process. It is an ideal machine to produce superiorquality gummy candy of single color and double color; By change-over molds or depositors, different color and different shape of gummy can be also produced. The on-line mixer achieves the quantitative dosing and mixing of the flavor, color and acid. High degree of automation can produce super quality of gummy, at the same time it saves the manpower and the space occupation.
Model | GD150Q | GD300Q | GD450Q | GD600Q |
Capacity | 150kg/h | 300kg/h | 450kg/h | 600kg/h |
Candy Weight | According to the size of candy | |||
Working Condition | 20~25° temperature humidity 55% | |||
Electric Power Needed | 16kw/380v | 26kw/380v | 32kw/380v | 36kw/380v |
Total Length | 18m | 20m | 20m | 22m |
Weight Of Machine | 3000kg | 4500kg | 5000kg | 6000kg |
Product Detail
Part 1:Cooking System
Cooking system is consists of jacket cooker and storage tank.Jacket cooker can dissolve sugar and maltose rapidly, reach full uniform effects of dissolving Storage tank is used to storage liquid and decrease the temperature of liquid.
Part2:Depositing System
High accuracy fabrication technology for deposit piston and copper makes the same candy weight.Flavor and color mixer can effectively mix flavor color and other ingredients.The an oil-spraying machine makes the candy easier to demold.
Part3:Cooling System
The cooling system is used to cool the temperature of the candy.Stable running with low noise and long life. it is much stronger than other factory with 1mm or 2mm thickness frame.
Other Parts
Pour the boiled syrup into the hopper and deposit it into the mold.
After cooling, the mold will be extruded, and then the candy will be extruded.
The gummy candy is sent to the outlet by the conveyor belt, during which it will be cooled again.
The finished gummy candy falls into a special plastic plate and is collected.
Finished Products
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.