Socket Fusion Machine 75-110MM Ppr Sockets Plumbing Tools And Equipment
Fusing Pipe Scope
20MM~63MM
Rateed voltage
A.C220/230V,50/60Hz
Power
800/870W
Working Temperature
260℃±3%
Environment Temperature
-5℃~45℃
Appllicable Material
PP - R、PE
Net Weight Of Mchine
1.8Kgs
PCS/carton
2PCS
Carton Size
435×360×255(mm)
Weight/carton
16.5Kg
Lnciuding the following accessorirs:1PCS fusion tool、1PCS metal case、1PCS underpin stand、1purchase table-board clamp(optional)、1bag of bolts ang hex key wrench、Socktes D20、D25、D32、D40(optional)
Product Details
Product Features
Strong aluminum heater plate,
Thickness to 19mm,
Teflon surface is optional,
Inside heating element 110V and 220V optional.
ABS+Strong Nylon handle,
LED working light and digital screen,
Aluminum moulded insulation cover,
Magnesium material cooling fin.
VDE copper wire and rubber cover cable,
Cable long to 3m,
Support worldwide plugs,
Plug cover protective.
Strong and stable U type machine support,
Special use table clamps,
Stainless steel wrench and screw.
Aluminum material with Daikin teflon, Size support DVS and ASTM standard, Heating sockets, repair sockets and saddle sockets are provided.
Steel box, thickness 1.0mm,
Support OEM color paint,
Support OEM LOGO engrave and sticker.
1. Fusion Preparation
Choose the suitable machine and sockets Prepare the cutter, fusion material.
2. Cutting the pipe
Cutting the necessary pipe length with the plastic pipe cutter.
3. Clearing the pipe
Clearing the fusion surface of pipe with alcohol.
4. Measure fusion depth
Measure the fusion depth according the fusion standard table and mark.
5. Heating
Put the pipe and fitting into the socketshorizontal, Heating time refer standard.
6. Connecting and cooling
Connect the heated pipe and fitting exactly and adjustment finish in 5s.
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 14 Feb, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.