Quantity | Price |
---|
Meat Pre-cut processing line
Carcass pre-cut processing line
The two-part body is unloaded by the unloading device and then enters the
pre-cut processing area. In front of each circular saw, at least one operator performs segmentation and positioning. The cut back
legs, front legs and middle sections enter their respective deboning and dividing processing lines.
Meat Bone cutting line and fat trimming line
1.1Deboning line for hind legsThe cut hind legs are conveyed again to the hind leg deboning line. The dividing line is equipped with 30 operating tables. The height of each operating table is 800mm, the length and width are 900mm and 400mm respectively, and these operating tables are connected to the conveyor. The spacing between each console is 600mm. Each operating table is equipped with 2 box racks, one on the left and one on the left, for storing the divided products. The size of the box frame is 620mm long, 420mm wide, and 350mm high. When the turnover box is full, it can be pushed into the heavy box conveyor line under the product conveyor to transport it to the packaging area.
1.2Boning and dividing line for the front leg
The cut front legs are conveyed again to the front leg deboning line. The dividing line is equipped with 30 operating tables. The height of each operating table is 800mm, the length and width are 900mm and 400mm respectively, and these operating tables are connected to the conveyor. The spacing between each console is 600mm. Each operating table is equipped with 2 box racks, one on the left and one on the left, for storing the divided products. The size of the box frame is 620mm long, 420mm wide, and 350mm high. When the turnover box is full, it can be pushed into the heavy box conveyor line under the product conveyor to transport it to the packaging area.
1.3Middle section deboning line
The cut mid-section carcasses are transported again to the mid-section deboning line. The dividing line is equipped with 30 operating tables. The height of each operating table is 800mm, the length and width are 900mm and 400mm respectively, and these tables are connected with the conveyor. The spacing between each console is 600mm. Each operating table is equipped with 2 box racks, one on the left and one on the left, for storing the divided products. The size of the box frame is 620mm long, 420mm wide, and 350mm high. When the turnover box is full, it can be pushed into the heavy box conveyor line under the product conveyor to transport it to the packaging area.
Customized POM conveyor belt production line meat processing line plan of halal slaughterhouse line
Detailed Images
Name | Meat cutting deboning line |
Framework Material | Stainless Steel 304 |
Surface treatment | Sand-blasted |
Motor Type | Domestic/imported |
Conveyor belt material | PU/POM |
Warranty Period | 1 Year |
Case Show
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.