SGB420/30 Gold Mining Equipment – High-Capacity Scraper Conveyor for Efficient Material Handling
The SGB420/30 Scraper Mine Tunnel Coal Feeder Conveyor is a high-performance conveyor designed to meet the demands of gold mining, coal mining, and power plant applications. Manufactured by Zhongmei, this equipment delivers a large capacity and high efficiency, ensuring smooth material handling in various mining and industrial environments..
Key Features
Large Capacity: Capable of handling up to 60 tons per hour, this scraper conveyor is ideal for high-demand operations.
Durable Construction: Built with high-quality materials and components for reliable long-term performance.
High Chain Speed: With a chain speed of 0.88 m/s, this conveyor system ensures swift and efficient material movement.
Powerful Motor: Equipped with a 22kW motor, ensuring strong performance even under heavy load conditions.
Versatile Design: Available with an 80m standard length, this conveyor is flexible for use in various mining and power plant setups.
Side Double-Stranded Form: Features a side double-stranded chain for stable and effective material transport.
Enhanced Durability: The conveyor’s 14*50mm chain size and a breaking load of ≥250 kN ensure robustness and resilience.
Voltage Options: Operates at 220/380V, making it adaptable to different electrical environments.
Model
SGB420/22
SGB420/30
SGB420/40X
SGB620/40
SGB620/55)
SGB620/80
Delivery Capacity (t/h)
60
80
100
150
150
150
Standard length(m)
80
100
100
100
100
160
Chain speed(m/s)
0.88
0.88
0.86
0.86
0.86
0.86
Electric motors
Model number
JDSB-22
JDSB30
JDSB40
DSB40
DSB55
DSB40
Power(kW)
22
30
40
40
55
2*40
Voltage(V)
220/380
380/660
380/660
380/660
380/660
380/660
Scraper chain
Form
Side double-stranded
Side double-stranded
Side double-stranded
Side double-stranded
Side double-stranded
Side double-stranded
Chain size(mm)
14*50
14×50
18×64
18×64
18×64
18×64
Breaking load(KN)
≥250
≥250
320
≥320
≥320
≥320
Product Info Gallery
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 24 Apr, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.