RZJD-G250 Full Automatic High Speed Sharp Bottom Paper Bag Making Machine
Properties and uses:
The machine for reel original colored paper or drum paper printing, such as kraft paper, glossy paper, medical paper roll consists of a paper bag process by puncture, center glue, color code length, raw material into a tube, set off long retreat, bottom fold bottom, bottom glue. Pocket bottom forming, complete finished bag finishing a. The machine operation more convenient, more efficient, more stable is in the production of a variety of different paper bags, fenestration bread bags, leisure food bag, bag of bread, dried fruit bags and so on environmental paper bag paper bag machine equipment.
Main features:
1. Using the French SCHNEIDER touch screen man-machine interface, operating at a glance, easy to control.
2 .Using the British TRIO Motion Controller (PC).
3 .Using the Japanese Original YASKAWA servo motor with the German original SICK photoelectric eye correction, accurate tracking printing bag size.
4 .The raw material loading and unloading adopts the pneumatic cylinder lifting structure, the roll adopts the full automatic constant tension control.
5 .Raw materials China correction using Taiwan Pasource , reduce the roll adjustment time alignment.
Main technical parameters:
Model
RZJD-G250
Length of cutting bag
110-460mm
Bag length
100-450mm
Bag width
70-250mm
Insert size
20-120mm
Bag mouth height
15/20mm
Bag speed
50-320pcs/min
Paper feed width
160-780mm
Paper material diameter
Φ1000mm
Inner diameter of paper
Φ76mm
Paper material thickness
35-80g/m²
Working Air Current
More than 0.12m³/ minutes, 0.5-0.8MPa
Machine power
380V3(phase)4(wire) 24kw
Total weight
4500kg
Machine Dimesion
7100x3000x2200mm
Machine Finished Picture:
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 15 Feb, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.