★The machines` casting bodys are made of special alloy steel through strict processing and heat treatment technology. High precision and good rigidity.★The table ball track is made of steel material, high-density steel balls, wear-resistant, light moving, and high efficiency. The manual worktable is driven by a synchronous belt with high stability.★The front and rear double V-shaped slides, and precision shoveling, not only slide smoothly and wear-resistant. ★The high-precision sleeve type grinding head adopts ultra-precision beveled rolling bearings. Such a design ensures long life of the bearing and the surface accuracy of the grinding.
Specification
Model
unit
MY820
Working table
Table Size (L×W)
mm
480*200
Max movement of working table(L× W)Control Panel
Max movement of working table(L×W)
mm
530*220
T-Slot(number×width)
T-Slot(number×width)
mm
1x14
Grinding wheel Max distance from spindle center to table surface
mm
420
Wheel Size (Outer diameter×width×Inner diameter)
mm
φ200×20×Φ31.75
Wheel speed
50HZ
r/min
2850
Max movement of grinding wheel Vertical movement(Manual)
60HZ
mm
3440
Longitudinal speed of working table
m/min
3-20
Cross feed(front and rear) on handwheel
Per revolution
mm
5.0
Total power of motor
Per graduation
mm
0.02
Vertical (up and down) feed on handwheel
Per revolution
mm
1.25
Speed
Per graduation
mm
0.01
Motor power
Spindle motor
Kw
1.1
Power
Coolant pump motor
w
40
Hydraulic system
Hydraulic motor
kw
1.5
Working pressure
Mpa
3
Oil tank capacity
L
80
Max flow
L/min
18
Working precision
The parallelism of working surface to base level
mm
300:0.005
Flow
Surface roughness
μm
Ra0.32
Net Weigh/Gross Weight
Kg
750/850
Chuck size (permanent magnetic chuck)
mm
200*400
Overall dimension(L×W×H)
mm
1680*1140*1760
Package dimension(L×W×H)
mm
1630*1170*1940
Details Images
1、480x200mm Permanent-Magnetic Table
2、Powerful Hydrualic Station
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 15 Feb, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.