Quantity | Price |
---|
Products Description
50-200mm 50m crawler dth full hydraulic pneumatic blast hole drilling rig mine rock drilling rig
Structure and working principle
1. Chassis: the drilling rig is equipped with a hydraulic crawler traveling chassis, which changes the situation that some
drilling rigs need to be moved manually.
2. Control system: hydraulic control system switch, drilling power unit forward and reverse and inching. The manual control valve
controls the hydraulic cylinder to realize the angle adjustment of the drill, the lifting, drilling and walking of the drill. At
the same time, remote control and manual drilling control can be selected.
3. Hydraulic system: diesel power is used to drive the pump station. (It can also be changed to motor)
4. Drill frame structure: the drill frame adopts three sliding blocks to form the main outer frame of the drill frame, and the
main hydraulic cylinder connects the auxiliary sliding blocks of the drill frame to form reciprocating motion; The auxiliary slide
block of the drill frame is connected by two auxiliary hydraulic cylinders to the third slide block of the drill frame to form
reciprocating motion. The two items can be superimposed to meet the demand of loading 2 meters of drill pipe.
5. Drilling angle: the angle of the drill frame is controlled and adjusted by the hydraulic cylinder, which can achieve 35-120
degree construction (- 120 degree is a special requirement).
6. Drilling power head: hydraulic power.
Product Paramenters
GF880 DTH Drilling Rig | |
Model | GF880 |
Power source | Air |
Rock rigidity | F=6~20 |
Diam. of hole(mm) | 50~200 |
Drilling depth(m) | 50 |
One-time advance length (mm) | 1000-2000 |
Air consumption(M3/min) | 3-12 |
Using air pressure(Mpa) | 0.5-1.5 |
Drilling tool speed(r/min) | 0-140 |
Maximum driving force(N) | 6000 |
Motor power(kw) | 11 |
Applicable voltage(V) | 380-24 |
Cylinder diameter(mm) | 115 |
Piston displacement(ml) | 1250 |
Rated speed(r/min) | 2200 |
Rated power(kw) | 16 |
Fuel tank capacity(L) | 15 |
Fuel oil capacity(L) | 2.5 |
Cooling mode | Water-cooling |
Operating Weight(T) | 1.5 |
Adaptive air compressor(Cube) | 13 |
Dimension(m) | 1.4*2.4*3.1 |
Pictures
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.