Quantity | Price |
---|
Product Description
1. Small and portable, easy to move, suitable for small scale mining, with low investment but very high efficiency and quick results. 2. Grizzly is equipped according to mines condition. With grizzly big stones are separated away which reduces the plant’s working pressure, improves the working efficiency and extends the service life.
3. Light weight, with wheels equipped, portable, one person easily dragging & operating. Model KD-5 of mini trommel screen can be carried by a pick-up.
4. Easy operation, easy dis-assembly & installation, single person operation.
5. World famous brand engine and pump with strong power, such as Honda, Kipor, KOHLER etc.
6. Trommel screen end is equipped with sluice which changes direction of tailing in case of mixture with fine material.
7. Sluice is made of stainless steel. Anti-rust, anti-corrosion, anti-abrasion.
8. Carpet in the sluice is made by Mitsubishi. Durable, double-layer, anti-skid, anti-abrasion, anti-corrosion, high recovery rate up to 90%.
9. Package: angle iron frame & plywood, strong frame with lifting ring, can be moved by forklift or crane, strong packing in case of damage and spare lost.
SPECIFICATION OF PORTABLE GOLD TROMMEL WASH PLANT | ||
Model | JZM-5 Gold Trommel | JZM-10 Gold Trommel |
Size | 2800*1100* 1400 | 2900 *1200*1500 |
Capacity | 1-5t/h | 5-10t/h |
Screen size (mm) | 400(Dia.)*1400(Length) | 530(Dia.)*1800(Length) |
Mesh | 8mm | 8mm |
Driven type | by belt | by belt |
Diesel engine | Portable Diesel Engine with CE certificate | Portable Diesel Engine with CE certificate |
Power | 2.5KW | 3.6KW |
Feeder hopper(mm) | 1066*568 | 1200*810 |
Gold Felt | 1500*400(1pc) | 2000*600(1pc) |
Water pump | 2inch with water pipe | 2inch with water pipe |
Volume Capacity | 4m3/h | 5m3/h |
Port | Qingdao port, Shandong |
This is the basic parameter, we can according to the condition of your mine to specify the exclusive scheme!
1.Feeding System
a. Streamlined design in Feed Hopper guarantees material can go into the equipment and be separated smoothly in case the material accumulates in the feed hopper.
b. Grizzly is equipped on the feed hopper which can separate away the big stone bigger than 80 to 150mm. The use of grizzly reduces
the working pressure and extend the service life.
2.Screen System
a. Clay Scrubber is to break off hard clay's to increase gold recovery. b. The double-layer Trommel Screen is made of high manganese steel wire. The support frame for screen is made of 20CrMo which is usually used as oil extraction rod.
The screen is fixed by screws and is easy for screen changing. The screen exchanging period is more than half a year longer than other material’s screen’s 2 to 3 months.
3.Shaking Table
The Shaking Table further processes small-sized concentrators form sluices or concentrates.
4.Mercury Amalgamator
With the help of Mercury, to extract all the gold out from the concentrates that recovered by the sluice and concentrators. Recovery rate: 100%
5.Gold Smelting Furnace
Smelting Furnace to smelting the gold sand and make into final product of gold bars.
JINZUN MINING PROCESS
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.