The BIG/LARGE/HEAVY DUTY PREMADE POUCH LOAD OPEN FILL SEAL machine is an automated solution for handling premade pouches, including three-side seal bags, stand-up bags, ziplock bags, gusset bags, and more. It performs a fully automated cycle for bag pick-up, opening, filling, sealing, and outputting the finished product. This versatile machine is designed for food packaging, making it ideal for items like coffee, frozen foods, biscuits, cereals, nuts, powdered materials, candy, and more.
Key Features
Versatile Pouch Types: Compatible with various preformed bags such as three-side seal, stand-up, ziplock, and gusset bags.
Automated Process: Handles automatic bag pick-up, opening, filling, sealing, and finished product output.
Wide Application: Suitable for packaging different types of food and non-food items.
Precision & Reliability: Features PLC control and cylinder-driven operations for low error rates and easy maintenance.
Adjustable Bag Magazine: Accommodates various bag sizes and shapes for flexible packaging requirements.
Vacuum Function: Equipped with a vacuum pump for vacuum sealing capabilities.
Electric Induction Components: Ensures smooth operation and accurate packing.
Product Packaging
The machine is designed to handle a wide range of products and pouch sizes, making it a flexible and efficient choice for high-volume packaging needs.
Product Parameters
Model
GDD-1-300
GDD-1-300L
GDD-1-300M
Power Voltage
AC 220/50
AC 220/50
AC 220/50
Gas Source
0.5 m³/min, 0.65 MPa
0.5 m³/min, 0.65 MPa
0.5 m³/min, 0.65 MPa
Electric Power
500W
500W
500W
Packing Speed
6-15 bags/min
5-8 bags/min
6-15 bags/min
Sealing Width
10 mm
10 mm
10 mm
Temperature Range
0-300°C
0-300°C
0-300°C
Bag Size
100≤Width≤300, 100≤Length≤430
100≤Width≤300, 100≤Length≤430
80≤Width≤300, 100≤Length≤430
Suitable Bag Type
Three side sealing, Doypack (no zipper)
Doypack (with zipper)
Accordion bag (M fold bag)
External Size (L×W×H)
1827×676×1611 mm
1827×676×1656 mm
1827×676×1611 mm
Net Weight
315 kg
315 kg
315 kg
Applications
Food Packaging: Ideal for items such as coffee, frozen food, biscuits, cereals, nuts, powdered materials, candy, and more.
Non-Food Applications: Suitable for a range of other products needing similar packaging methods.
This machine offers high-efficiency and reliable performance, ensuring your packaging process is both effective and cost-efficient.
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 24 Apr, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.