Quantity | Price |
---|
The High Efficiency Indoor Electric Clothes Garment 100kg Gas Clothes Commercial Industrial Laundry Dryers Dry Machine is the perfect solution for all your laundry needs. With its versatile features, this machine can handle a variety of fabrics and items, making it a valuable addition to any business or household.
Model | YZⅢ-2500 | YZⅢ-2800 | YZⅢ-3000 | YZⅢ-3200 |
Max Ironing Smooth Width (mm) | 2500 | 2800 | 3000 | 3200 |
Ironing Speed (m/min) | 3-20 | 3-15 | 3-20 | 3-20 |
Max Heating Temperature (°C) | 158 | 158 | 158 | 158 |
Steam Pressure (Mpa) | 0.4-0.6 | 0.4-0.6 | 0.4-0.6 | 0.4-0.6 |
Steam Consumption (kg) | 300 | 350 | 380 | 400 |
Motor Power (kw) | 2.2 | 2.2 | 2.2 | 2.2 |
Rated Voltage (V) | 380 | 380 | 380 | 380 |
Dimension (L.W.H) (mm) | 3700*3100*1385 | 4000*3100*1385 | 4200*3100*1385 | 4400*3100*1385 |
Total Weight (kg) | 3300 | 3500 | 3800 | 4000 |
Choose from 1, 2, 3, or 4 rolls and steam, electric, or LPG gas heating options to fit your specific needs.
Efficiently handles a variety of items such as bedsheets, quilts, tablecloths, towels, curtains, and bath towels.
Variable speed motor allows for adjustable speed based on heating temperature and fabric thickness.
Large diameter roller drum with a smooth surface reduces fabric abrasion.
Reliable transmission with a reducer connected to the pulley and chain wheel.
Sealed rotary joints prevent leakage for safety, reliability, and energy savings.
All vice-rollers are zinc sprayed for strong anti-corrosion properties.
Durable and strong carbon steel frame and auxiliary structures.
Equipped with a three-phase electrical system, overload protection, voltage and short circuit protection, and an emergency stop switch for added safety.
Laundromats
Hotels
Hospitals
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.