Elevate your production capabilities with the HG-FJ-500L. Designed for high productivity and efficiency, this stainless steel pressure vessel is ideal for various industrial applications.
Key Features and Benefits:
Spacious Capacity: With a useful capacity of 500L and a gross capacity of 650L, you can handle large batches with ease, maximizing your output.
Durable Construction: Crafted from high-quality Stainless Steel 304, ensuring longevity and resistance to corrosion for reliable performance over time.
Customizable Options: Available in 220V, 380V, or customized voltages, and dimensions to fit your specific operational needs.
Advanced Cooling System: Features a dimple jacket plate cooling method that ensures efficient temperature control during processing.
Easy Cleaning: Equipped with a CIP in situ cleaning system, including a rotary spray cleaning ball, for quick and thorough maintenance.
Robust Design: Inner thickness of 3mm and external thickness of 2.5mm provide strength and durability, while the test pressure of 0.2Mpa ensures safety.
Conclusion:
The HG-FJ-500L is your go-to solution for high-capacity, efficient processing. Designed for durability and easy maintenance, it is perfect for any production environment.
Don’t miss out on transforming your operations! Click below to order your HG-FJ-500L today and enhance your productivity!
Model
HG-FJ-500L
Capacity
Useful capacity:500L; Gross capacity:650L
Material
SUS304
Application
Restaurant, bar, hotel, brewery
Cooling method
Jacket section cooling
Thickness
Inner:3.0mm; External2.5mm
Outrigger
Ø102mm*4
Test pressure
0.2Mpa
Working pressure
0.09Mpa
Heat exchange area
1.8m2
Weight
300kg
Fermenter advantage : 1). 304 stainless steel plate as a whole, and our stainless steel plate manufacturer is the best in China .2). The cooling efficiency. of Maitreya plate jacket is greatly improved. 3). Two stage cooling mode . 4). The insulation layer material is high-grade polyurethane with a thickness of 80mm. 5). Polishing accuracy up to Ra0.4μ m . 6). Strict tank pressure test . 7). Energy conservation and pollution emissions.
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 23 Apr, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.