Industrial Caramel Sweet Popcorn Machines Commercial Snack Pop Kettle Corn Production Line
Zhongtai’s popcorn machines are designed with both gas heating and electromagnetic induction heating options, catering to a wide range of production capacities. With the flexibility to integrate into larger production lines, this system can produce up to 6 tons of popcorn per day. For smaller production needs, the machine can also function alongside a shorter production line, with a minimum length of 7 meters.
Features:
High Capacity Production: Capable of producing up to 100-120 kg of popcorn per hour.
Flexible Heating Options: Choose between electromagnetic heating, steam heating, gas heating, or heat transfer oil heating.
Fully Automated System: Designed for easy, one-click operation to streamline the production process.
Integrated Production Line: Can be connected to a larger system for up to 6 tons per day or used independently for smaller needs.
Specifications:
Component
Details
Name
One-click Popcorn Machine
Capacity
100-120 kg/h
Power
35KW
Size
275020002550 mm
Heating Method
Electromagnetic, Steam, Gas, Oil
Popcorn Conveyor Elevator
Power: 1.5KW, Size: 770015001800 mm
Popcorn Cooling & Separating Machine
Power: 1.5KW, Size: 480018502100 mm
Applications:
Widely used in food industries such as snack production, including lotus seedlings, fruit purees, bean stuffing, jujube, sauces, and curry conditioning. It is also suitable for daily chemical mixing and processing.
This machine is designed to meet the needs of high-volume popcorn production, offering both flexibility and efficiency.
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 23 Apr, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.