One or both sides of the mining cart body can be opened, and the mining cart can be tilted with the help of the unloading track installed on the unloading point. The pull rod opens the side door for unloading. The trunk has a large volume and high efficiency, which is named after the frequent shuttling between vehicles. The bottom plate of the material cart body is opened and unloaded backwards or to one side using gravity.
There is a rim on the inner side of the wheels of the mining material cart, and there is a certain gap between the rim and the steel rail. The tread of the wheel in contact with the steel rail is made into a cone to maintain the alignment of the wheel set during operation along the track, reduce mechanical wear, and reduce running resistance.
Model
Loading
/t
Garuge G
(mm)
Overall Dia(mm)
Wheel Base
C
Wheel Dia
D
Traction
Height
h
Rated
Traction/
KN
Length L
Width B
Height H
MLC2-6
2
600
2000
880
1150
550
300
320
60
MLC3-6
3
600
2400
1050
1200
750
300
320
60
MLC5-6
5
600
3450
1200
1200
1100
350
320
60
MLC5-9
5
600
3450
1320
1300
1100
350
320
60
MLC3-9A
5
600
2100
1150
1300
600
350
270
60
PRODUCT ADVANTAGE
The wear of the pin shaft of the chain link that bears traction force shall not exceed 15% of the original size, and the bending value of the chain link pin shall not exceed 10% of the diameter.
Cast steel joints shall not show cracks, and buffer springs shall not break or undergo permanent deformation.
The material carts should run smoothly, and the difference in tread diameter between two wheels of the same wheelset should not exceed 2 mm; When one of the four main wheels of the same material vehicle does not contact the rail surface on a flat track, the gap should not exceed 2 mm. Otherwise, it is necessary to immediately stop running and carry out repairs or adjustments.
The wheels shall not have cracks, and the excess thickness of wheel flange wear shall not be less than 13 mm, and the excess thickness of tread shall not be less than 7 mm.
The wheels should be oiled every two weeks, and new oil must be used to top out the old oil.
The steering device is flexible and reliable, and should rotate flexibly in both horizontal and vertical directions.
MAIN PRODUCT
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 14 Feb, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.