Product Introduction Of Coal Mine Tunnel Drilling Rig Bore Well Drilling Machine Price For Sale
1. Power head full hydraulic combined drilling rig, split structure, convenient for underground transportation, displacement and installation.2. The drilling rig is composed of hydraulic pump station, power head, frame, control console, column support and other components. It is connected with high-pressure oil pipe during operation, and is safe to operate away from the orifice.3. The hydraulic system design is mature, simple, reliable, easy to master, easy to analyze and solve when a fault occurs.4. Double column or four column support, one anchor can be drilled porous, light weight, high efficiency, strong applicability.UX600 Portable mine full hydraulic tunnel drilling rig is mainly composed of pumping station, power head, frame, column frame, operating table and drilling tools. The pump station and power head of the drilling rig are connected by high pressure pipes of different diameters. All the joints are fast joints. It is convenient to install, remove and transport. Pumping station drives oil pump to rotate by explosion-proof motor, converts electric energy into hydraulic energy (pressure oil) of rotating oil circuit and pushing oil circuit, and then transfers pressure oil to hydraulic actuator through valve group on control platform, thus realizing various functions of drilling rig.zmwm19
Product Paramenters
Product Paramenters Of Coal Mine Tunnel Drilling Rig Bore Well Drilling Machine Price For Sale
Technical Parameter
UX300
UX600
UX800
UX1000
Rig type
Fully hydraulic pit drilling rig
Drilling capacity (B/N/H)
400 / 300 / 150 m
600 / 500 / 220 m
1000 /800 / 520 m
1200 / 1000 / 620 m
Engine power (electric)
37KW
55 KW
75 KW
90 KW
Feed stroke
1.1 m
1.8 m
1.8 m
1.8 m
Max. torque
650 Nm
1800 Nm
2000 Nm
2250 Nm
upgrading power
38 KN
65 KN
75 KN
89 KN
Max. Drill Pipe Diameter
90 mm
90 mm
90 mm
90 mm
Suitable length of drill pipe
1.5m
1.5m / 3 m
1.5m / 3 m
1.5m / 3 m
Weight
1550Kg
3150Kg
3350Kg
3500 Kg
Forms of transport
Towing/manual labor for carrying
Details Images
Details Images Of Coal Mine Tunnel Drilling Rig Bore Well Drilling Machine Price For Sale
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 14 Feb, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.