Quantity | Price |
---|
The air bubble cleaning machine is made of stainless steel SUS304 except for standard parts such as motors and bearings, which fully meets the export food hygiene requirements. The equipment is equipped with a bubble generating device to make the material tumble and remove the pesticide residues on the surface of the product. At the same time, an appropriate amount of agent can be added to disinfect and fix the color. Floating objects can overflow from the overflow tank and sediments can be discharged from the sewage outlet to achieve the purpose of cleaning. Under the joint work of bubbles, surfing, lifting, spraying, etc., the equipment has the characteristics of high cleaning, energy saving, water saving, stable and reliable equipment, and can maintain the original color. t is an ideal equipment for the vegetable, food processing, catering and other industries.
The bubble cleaning machine is suitable for cleaning, soaking, sterilizing and fixing leafy vegetables, edible fungi, fruits, aquatic products and Chinese herbal medicines, etc. (Common inquiries such as apples, plums, tomatoes, lettuce, etc.)
Model | GRT-B2500 |
Power | 3.75KW |
Machine Size | 2500*1000*1350mm |
Capacity | About 500kg/h |
Weight | About 300kg |
Model | GRT-S-4000 |
Power | 0.75KW |
Mesh belt width | 600mm |
Picking station | 4 on each side |
Size | 4000*1200*900mm |
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.