1.Introduction:Bread crumb processing line is researched and developed on the basis of international advanced technology.The perform-ance and quality have reached the highest domestic level of the same line.The line changes the traditional making process.From mixing materials,extruding,cutting,drying to finished products are done in one automatic line.The bread crumb is widely used as food coating additives on the surface of frying foods like:frying chincken,fish,sea foods,onion ring etc.The taste is fragrant,crispy,delious and with rich nutrition.
4.Voltage in China:Three phases: 380V/50Hz, Single phase: 220V/50Hz, we can make it according to customers' Local voltage according to different countries.
Sample
Manufacturing process
1
Mixer
It makes the powder raw materials and additives stirred(first step)
2
Screw conveyor
It conveys the mixed raw materials to extruder hopper directly.
3
Extruder
Raw material can be extruding different shape by the high temperature and high pressure and make the product safe.
4
Cutter
can be hauled to form the Continual strip-shaped, after shaping, it can become orderly, clean, and the right dimension.
5
Hoister
Transmit products to humid crusher
6
Humid crusher
Crush the finished products in small size.
7
Vibrate sifter
Remove the dust,the dust will not come into dryer.
8
Air conveyor
Transmit products to Dryer
9
Dryer
The heating way is electricity heating. It is used to bake and dry food.
10
Air conveyor
Transmit products to classification sifter
11
Classification sifter
Classification according to different sizes of products
Real machine in our factory
Technical parameter
Model
Installed power
Power consumption
Output
Size
SLG65
58KW
38KW
120-150kg/h
20000x1200x2200mm
SLG70
70KW
50KW
200-250kg/h
22000x1500x2200mm
SLG85
130KW
85KW
450-500kg/h
24000x1500x3500mm
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 14 Feb, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.