Intelligent high-temperature automatic pig manure compost machine for organic waste composting is mainly used for high-temperature aerobic fermentation of livestock and poultry feces, kitchen waste, domestic sludge and other wastes, and uses the activity of microorganisms to biologically decompose the organic matter in the waste to achieve no Integrated sludge treatment equipment for harm, stabilization, reduction and resource utilization. Livestock and poultry manure can be turned into high-efficiency and high-quality organic fertilizer raw materials after fermentation in this tank, which realizes waste recycling and forms a virtuous ecological cycle.
This kind of processing equipment can carry out the fully enclosed fermentation treatment of livestock and poultry manure, which not only completely kills harmful bacteria and pathogens, but also does not pollute the environment. It solves the problem of odor that is easy to produce when manure is stacked and dried. It has good ecological and economic benefits. And social benefits.
1. High temperature aerobic fermentation, using high temperature biological bacteria technology, low energy consumption, fast fermentation and low operating cost;2. The equipment occupies a small area,3. High degree of automation, one person can complete the fermentation process;4. Through biological deodorization equipment to achieve gas emission up to the standard, without secondary pollution;5. The main body of the equipment is made of special stainless steel material, which reduces corrosion and has a long life;6. Main body insulation design, auxiliary heating to ensure normal operation of equipment in low temperature environment;6. The treated domestic sludge, kitchen waste, livestock and poultry manure are used to process organic fertilizer and realize resource utilization.
Technical flow
Technical data
Model
TLF-32S
TLF-70S
TLF-90S
TLF-116S
Fermentation room volume
32m3
70m3
90m3
116m3
Top air blower
/
/
4kw
4kw
Bottom air blower
7.5kw
7.5kw
17kw17kw
5m3/h
Hydraulic power station
4kw
7.5kw
7.5kw
7.5kw
Lifting motor
1.5kw
2.2kw
2.2kw
2.2kw
Feeding motor
0.37kw
0.75kw
0.75kw
0.75kw
Exhaust fan
1.5kw
2.2kw
4kw
4kw
Auxiliary Heater
2kw
4kw
12kw
12kw
Weight
12000KGS
23000KGS
26000KGS
30000KGS
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 14 Feb, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.