Quantity | Price |
---|
Product Introduction
Tabber&Stringer machine adopts IR soldering method, servo motor driving and Industrial CCD positioning&detection for defective solar cell excluding automatically. The soldering effect, such as cell spacing, cell numbers of single string, soldering temperatures and etc, can be adjusted according to requirements. It can be integrated with automatic layup machine to achieve the composing and locating of solar cell strings on tempered glass.
Features
◆Motor drive guide rail cell positioning.
◆High speed electric cylinder cell classification handling and positioning.
◆Flux accurate and quantitative smear.
◆Original ribbon flexible pressure holding mechanism.
◆Infrared heating, subsection soldering, closed loop control of soldering temperature and power, temperature raise smoothly and
small heat shock, effectively reduce the solar cell breakage rate.
◆This equipment soldering 156×166mm ×1/2、1/3、1/4 solar cell, can realize mono-crystalline solar cell multiform soldering.
◆Can realize mono-crystalline solar cell (min 1/3) chamfer to the front, back and right angle middle soldering.
Equipment Performance
Overall dimension | 3875mm×1320mm×2100mm | |
Transmission mode | All Inclusive hemp belt delivers assembly, servo positioning | |
Soldering max capacity | 1200-4000PCS/hour | |
Breakage | <0.2% | |
Size of panel | 125mm*125mm,156mm*156mm(40mm-156mm)*156mm | |
Soldering head | Compatible 2-5 busbar at the same time | |
Busbars peel strength | >2N | |
Cell spacing | 1.5mm-40mm Adjustable | |
Deviation of Ribon and grid line | <±0.2mm | |
Battery string straightness deviation | <1mm | |
Power supply | 3-phase 380V,50HZ(need reliable grounding) | |
Applicable air pressure | 0.6~0.8MPa | |
Compressed air flow | 100L/min | |
Power consumption | 12.5KW |
Production Line
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.