B21, China Town Mall, Midrand
Welcome to Afrimart OnlineWrap new offers/gift every single day on Weekends.New Coupon Code: Fast024
Something you love is now on sale! Buy Now !
50mm Single Head or Double Head Metal Steel Pipe and Tube End Forming Machine

0 Customer Reviews

  • Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 03 Feb, 2026, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
  • Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
  • Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
  • Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
1. What is the maximum tube diameter this machine can process?

The machine supports a maximum shrinking (diameter) capacity of 50 mm.

2. What materials can be formed with the 50mm Pipe and Tube End Forming Machine?

It is suitable for various metals including brass, copper, stainless steel and carbon steel.

3. What is the maximum wall thickness the machine can handle?

Maximum shrinking capacity (thickness) is 2 mm.

4. How long is the tube contracting (reduction) length capability?

The machine can contract tube ends up to 110 mm in length.

5. What is the production speed or cycle time?

Typical tube contracting cycle is 1–2 seconds per operation, depending on material and settings.

6. What power supply does the machine require?

The machine has a 4 kW power requirement. Ensure your facility can provide appropriate electrical supply.

7. What is the difference between the single head and double head versions?

The single head version processes one tube end at a time and is suited to lower-volume or bespoke work; the double head version can form two ends simultaneously or reduce handling for higher throughput and productivity.

8. Is the machine fully automatic?

The machine is semi-automatic, offering automation features to improve efficiency while still requiring operator setup and oversight.

9. What are the machine's weight and physical considerations?

The machine weighs approximately 250 kg. A stable mounting surface and adequate floor loading capacity are recommended.

10. What core components and quality assurances are provided?

Core components include the motor and pump. A machinery test report and a video of outgoing inspection are provided with each unit.

11. What after-sales service or warranty is offered?

After service support is provided for 1.5 years. For details on warranty scope, spare parts and service response, consult the supplier.

12. Which industries and applications is this machine best suited for?

Applicable industries include building material shops, manufacturing plants, machinery repair shops and construction works. Typical applications are manufacturing and custom forming of pipe/tube ends and repairing machinery components.

13. What maintenance is required to keep the machine running reliably?

Regular maintenance should include routine inspection of the motor and pump, lubrication of moving parts, checking tooling for wear, and following the manufacturer's maintenance schedule. Keep the machine clean and address abnormal noise or performance immediately.

14. What safety or operator training is recommended?

Operators should receive training on semi-automatic operation, safe handling of formed tubes, emergency stop procedures and lockout/tagout practices. Use appropriate personal protective equipment and follow site safety rules. The supplier can provide operation guidance and training recommendations.

0

0 Overall Rating
  • 5
    0%
    0
  • 4
    0%
    0
  • 3
    0%
    0
  • 2
    0%
    0
  • 1
    0%
    0

Review this product

For you to write a review, you need to login first

Login

Latest Order Arrivals

Discover our latest orders

12 Heads Embroidery Machine
12 Heads Embroidery Machine
Dewatering Pump Machine
Dewatering Pump Machine
Order Collection
Order Collection
Portable Water Drilling Rig
Portable Water Drilling Rig
Order Usefully Collected
Order Usefully Collected
Batch of Orders
Batch of Orders
Agriculture Processing Machines
Agriculture Processing Machines
Meat Grinder Machine
Meat Grinder Machine
Water Pump Equipment
Water Pump Equipment
Packaging Machine and accessories
Packaging Machine and accessories
Fabrics Manufacturing Equipment
Fabrics Manufacturing Equipment
Mining Equipments
Mining Equipments
Food Processing Machine
Food Processing Machine
Batch of Orders
Batch of Orders
Batch of Orders
Batch of Orders
Latest Orders Labelled
Latest Orders Labelled
wheel alignment machines
wheel alignment machines
new arrivals
new arrivals
Pre Orders Offloading
Pre Orders Offloading
Latest Arrivals
Latest Arrivals
Latest Arrivals
Latest Arrivals
Latest Arrivals
Latest Arrivals

Related Products

Recently Viewed Products