This tunnel oven is designed for fast and efficient batch transfer coating of cups, capable of transferring 160 cups per hour. With its adjustable temperature and speed settings, it offers versatility and high performance for various cup coating applications.
Product Parameters
External Dimension: L1100 x W600 x H670 mm
Maximum Feeding Material Size: L800 x W400 x H200 mm
Machine Weight: 50 kg
Maximum Loading Weight: 15 kg
Voltage: 220V, 50-60Hz
Power: 5.5 KW
Temperature Range: 0 ~ 300°C
Speed Range: 0 ~ 10 m/min
Main Features
Wraps & Shrink Sleeve Compatibility: Can handle a variety of transfer coating methods.
Main Switch: Convenient one-button opening and closing design for easy operation.
Control Panel: LCD screen and rotary switch for user-friendly control.
Power Interface: Safely located on the side of the control box for added security.
Cooling Features: Hollow holes, cooling fans, and gaps between the machine and oven ensure fast heat dissipation and safe operation.
Stainless Steel Heating Tube: Durable, resistant to damage, and easy to transport.
Visual Window: Enables easy observation of the transfer process.
Conveyor System: A combination of mesh belt and chain, providing high strength and capacity.
Product Instructions
Clamp the cup into the fixture, set the desired transfer temperature, and adjust the speed knob (usually between 8-10 minutes at 200°C).
Place the cup into the oven and wait for it to transfer out from the other side.
The machine comes with various fixtures designed to accommodate different cup sizes, meeting diverse customer needs for both half-size and full-size cups.
This tunnel oven offers reliable, high-speed transfer and coating for various cup types, delivering efficiency and precision in a range of production environments.
Tunnel oven for fast batch transfer coating cups, transfer 160 pcs cups per hour
Main switch
Convenient one-button opening and closing design, simple and practical
Control panel
Simple combination of LCD screen and rotary switch for easy and convenient operation
Power interface
The wire is on the side of the control box for a safer design
Hollow hole
Cooling fan
Gap
Hollow holes, cooling fans, gaps between the machine and the oven, all these for machine faster heat dissipation and safe work
Stainless steel heating tube
Firm and not easy to damage, easy to transport
Visual window
Easy to observe the transfer process at any time, control conveyor speed
Conveyor
The double combination of mesh belt and chain makes the conveyor belt stronger and the bearing capacity is high.
Product instructions
Clamp the clamp on the cup, set the transfer temperature, adjust the knob speed (usually controlled at 8~10 minutes, 200 °C), put it into the oven, and wait for the cup to come out from the other side.
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 13 Apr, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.