The main component of ball mill is a cylinder with bigger diameter and smaller length which is revolved by transmitting machinery. Materials are put in cylinder through the feed opening and then thoroughly grinded. The falling course of iron balls and ores can produce huge falling impact and autogenous grinding. The continuous feeding of ores can create considerable pressure to make ores move from feed opening toward discharge opening. Finally, acceptable particles are discharged from the discharge opening. Acceptable ore particles are carried away by water by wet mill, or by air by dry mill. It is usually used for fine grinding.
Product parameters
Model
Speed (r/min)
Weight of ball
Size of feed opening(mm)
size of outputting feed (mm)
Production (t/h)
Power (kw)
Weight (T)
900×1800
38
1.5
≤20
0.075-0.89
0.65-2
18.5
3.6
900×2100
38
1.3-1.4
≤15
0.075-0.83
0.7-3.5
18.5
3.9
900×3000
38
2.7
≤20
0.075-0.89
1.1-3.5
22
4.5
1200×2400
32
3.8
≤25
0.075-0.6
1.5-4.8
30
11.5
1200×2800
32
3.3-3.5
≤25
0.075-0.6
2-6
30
13
1200×4500
32
7
≤25
0.075-0.4
1.6-5.8
45
13.8
1500×3000
27
8
≤25
0.075-0.4
2-5
75
17
1500×3500
27
6.75-6.4
≤25
0.075-0.4
3-7
75
17.5
1500×4500
27
14
≤25
0.075-0.4
3-12
110
21
1500×5700
27
15
≤25
0.075-0.4
3.5-8
115
24.7
1830×3000
24
18
≤25
0.075-0.4
4-10
130
28
1830×3600
24
10.6-11.35
≤25
0.075-0.4
5-22
130
33.5
1830×6400
24
23
≤25
0.075-0.4
6.5-15
210
34
1830×7000
24
25
≤25
0.075-0.4
7.5-17
245
36
2200×5500
21
30
≤25
0.075-0.4
10-22
210
48.5
2200×6500
21
31
≤25
0.075-0.4
14-26
380
52.8
2200×7500
21
33
≤25
0.075-0.4
16-29
380
65
2400×3000
20.6
15.5-16.6
≤25
0.075-0.4
22-24
245
59
2400×4500
21
30
≤25
0.075-0.4
8.5-60
380
65
2700×3600
20.6
39
≤25
0.075-0.4
12-70
400
91.3
2700×4000
20.7
40
≤25
0.075-0.4
12-80
400
94
2700×4500
20.7
48
≤25
0.075-0.4
12-90
430
102
3200×4500
18
65
≤25
0.075-0.4
25-130
800
137
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 14 Feb, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.