Quantity | Price |
---|
Part 1: Machine Details | Qty |
Classic Design Single Girder Gantry Crane Lift capacity: 20.0 t Span: 10.0 m Cantilever: 0 m Lift height: 10.0 m Lift speed: 3.5 m/min (single speed) Cross traverse: 20 m/min (single speed) Long travel: 20 m/min (single speed) Work duty: A4 / M4 Input power: 380V/ 50HZ/ 3P Control: wireless remote control Condition: 100% new |
01 set |
Cable Drum Model: JTD125-100-4/D | 01 set |
Power Cable Model: 3* 25 mm2 Length: 20m + 10m spare= 30 m |
30 m |
Long Travel Rail (with enough accessories) Model:P30 . Length 20 m* 2 = 40 m |
40 m |
Part 2: Safety Device |
|
Part 3:Reference Picture
|
Part 4 : Advantage
| |
Part 5: Steel & Mechanism Parameters | |
General Parameters | |
Crane type | Universal Design Single Girder Gantry Crane |
Lifting capacity | 20.0 t |
Span | 10.0 m |
Cantilever | 0 m |
Lift height / hook height | 10.0 m |
Work duty | ISO, A4 / M4 |
Control type | wireless remote control + pendant button |
/ | With CE certificate |
Condition | 100% new |
Electric System | |
Power supply | 380V /50HZ /3P |
Electric box |
|
Current-collector bracket | The base is welded at end beam when fabricate. It needs to be bolted only at site, makes installation easier and saves time on-site when installation. |
Hoist power cable | It adopts flat cable on C-type steel with pulley, makes the main beam more clean , hoist working smoother, convenient for subsequent repair and replacement |
Lifting System | |
Lift speed | 3.5 m/min (single speed) |
lift motor | ZD52-4-18.5 kw |
Protection class | IP44 |
Hoist | Brands: Tavol, China |
Upper limit double limit, double protection, avoid punching the top. | |
Rope guide: The raw material is high-strength engineering plastic particles. Through mold pressing, good toughness, high strength, good wear resistance, self-weight light, reduce the wear of wire rope | |
Wire rope |
larger breaking pull force, higher safety factor.
avoid stranding wire ropes together. |
Cross Traverse System | |
Cross traverse speed | 20 m/min (single speed) |
Cross traverse motor | ZDY21-4-0.8 kw *4 |
Protection class | IP44 |
Hoist power cable | It adopts flat cable on C-type steel with pulley, makes the main beam more clean , hoist working smoother, convenient for subsequent repair and replacement |
Long Travel System | |
Long travel speed | 20 m/min (single speed) |
Protection class | IP54 |
Long travel motor | YSEW100LZ-2.2Kw *2 pcs |
Wheel | Φ400 *4 |
The wheels are all heat-treated. The appearance is coated with rust-proof oil, which increases the aesthetics. | |
Test Load | |
Static - 25% | Q X 1.25 kg |
Dynamic - 10% | Q X 1.10 kg |
Surface Treatment | |
All the parts will be painted 3 times , one time finishing coat and two times primer.
We use modern large-scale gantry through-blast production equipment. It removes surface rust and solder slag with iron sand, increasing the adhesion performance of the paint |
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.