Feature of High Frequency Wood Drying Kiln Dryer Timber Automatic Control System Woodwork
*Fast drying cycle: heating by high frequency dielectric power,many times faster than conventional wood kilns
*Automatic feeder: feeding cart with a motor,easy to push the timber into the dryer
*Optional capacity: 3m3, 4.5m3, 10m3, 13m3, small but with a quick,automated drying cycle, meet different customer's requirement
*PLC automated systems with touch screen panel: easy to set data and operate,only One-button start and stop
*Uniform heating: HF power acts on water or moisture in the wood, make sure moisture uniform after drying
*No sparking or bending problem: hydraulic press cart keeps the wood straight
*Veneer, panels, softwood and hardwood planks, heavy timber with large dimension: suiatble for all kinds of wood
*Patented weighing system: calculate the moisture by program automatically, and showing recent moisture on PLC screen all the time
*Stainless steel cooling system: stainless steel vacuum pump, pipe and condenser,avoid of rusting problem
*Schneider, Omron, Siemens etc European spare parts: International standard, good quality and easy to replace
Our engineers can provide overseas installtion, training and are available to provide after-sell service and maintenance. We recommend proper training for sfe and prolonged use of the machinery.
Bastic Parameter of HFVD100-SA
Overall Size
High Frequency Generator
1000*1050*2150mm
Tank
7300*2300*2300mm
Cooling System
1650*1050*1300mm
Gross Weight
10000kgs
Inner Diameter of Tank
1900mm
Stacking Timber Size
1300*1300*6000mm
Stacking Timber Capacity
10 cubic meters
Input Power of High Frequency Generator
70KVA
Output Power of High Frequency Generator
50KW
Temperature Testing
Fiber optic temperature sensor
Moisture Testing
Weighing sensors (PATENT)
Cooling System
Stainless steel condenser with stainless steel water-ring vacuum pump
Extraction
Full automatic by peumatic valves
Pressure of Hyrdraulic Cylinders
6 ton (4 pieces of stainless steel cylinders)
Vacuum Pump
Stainless steel type, 7.5KW
Feeding Cart
Automatic feeding cart
Tank Door
Safe and powerfull ear doors
Control System
Full automatic PLC touch screen
Packing
3 packages- 40 feet container
Optional Models
Model
HF Input Power
HF Output Power
Stacking Timber Size
Stacking Timber Capacity
Container
HFVD30-SA
40KVA
30KW
1*1*3m
3 cubic meters
20" GP
HFVD45-SA
40KVA
30KW
1*1*4.5m
4.5 cubic meters
40" HQ
HFVD100-SA
75KVA
50KW
1.3*1.3*6m
10 cubic meters
40" HQ
HFVD120-SA
75KVA
50KW
1.3*1.3*8m
13 cubic meters
40" HQ
Main Parts
1.High frequency generator
2.Control cabinet
3.Vacuum tank
4.Hydraulic system
5.Weighing system
6.Temperature tesing system
7.Cooling system
8.Full-auto feeder
Drying Cases
DOING RESEARCH IN CHILEAN UNIVERSITY
Case
Drying Time
Drying Result
Consumption
Sliced veneer
about 40 hours
High quality on flatness and water content uniform
200~250kw/cbm
Surface of floorboard
about 45 hours
High quality on flatness, no end cracking and deformation, no color change
about 200kw/cbm
Middle hardwood for second time drying
about 35 hours
Relieving tension, make water content uniform and make wood stable
about 150kw/cbm
Hardwood drying
Rosewood: 7 days
Red Sandalwood: 14 days
No cracking or deformation, moisture content uniform, more stable
about 500~600kw/cbm,different consumption for different wood
Large plank
7~10 days , moisture content from 60% to 20%,10cm thick+, like Birch,Larch,Pinus and Pine
No deformation on vertical direction, no cracking problem, more stable
different wood with different power consumption
Packaging & Shipping
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 14 Feb, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.