Biogas is an organic matter (agricultural waste, livestock and poultry manure, organic waste, kitchen waste, municipal sludge, high-concentration industrial organic wastewater, etc.) in an anaerobic environment and under certain conditions, the catabolism of various anaerobic microorganisms finally forms a mixed gas mainly composed of CH4 and CO2, which is a biochemical process.
The main component of biogas is methane (CH4), which usually accounts for 50% to 70% of the total volume; followed by carbon dioxide, which accounts for about 25% to 40% of the total volume; the remaining gases such as hydrogen sulfide, nitrogen, oxygen, hydrogen and carbon monoxide account for about 5% of the total volume.
After purification, biogas becomes biomethane. As a kind of biogas, it has the four major characteristics of cleanliness, high efficiency, safety and renewability. Its efficient preparation and comprehensive utilization are a representative two-way cleaning process. It is essential for a new type of energy.
The biogas is converted into CNG, and analyzed from the direction of utilization, all other components except CH4 are harmful components or impurities and need to be removed separately. The main impurity is CO2. Due to its higher content, the more it exists, the lower the calorific value of the gas. Excessive sulfur content will corrode equipment and pipelines and reduce their service life.
Specification
Model
Original gas
Produced gas
Dimensions
(Without compressor)
mm*mm*mm
The amount of biogas
Scope of CO2
Intake pressure
CH4 recovery rate
System pressure drop
SYTC-0.5
5000Nm3/d
20~60%
1.0MPa~4MPa
97~99.5%
<5%
6058*2438*2591
SYTC-1.0
10000Nm3/d
20~60%
1.0MPa~4MPa
97~99.5%
<5%
6058*2438*2591
SYTC-2.0
20000Nm3/d
20~60%
1.0MPa~4MPa
97~99.5%
<5%
6058*2438*2591
SYTC-3.0
30000Nm3/d
20~60%
1.0MPa~4MPa
97~99.5%
<5%
12192*2438*2591
Working principle
The MBR purification system is mainly composed of three parts: gas pretreatment system, pressurization system and membrane separation system. Among them, the membrane separation system can adopt a two-stage or one-stage system according to user requirements and project specific conditions.
After the biogas enters the membrane purification system, it first enters the dry desulfurization system to remove hydrogen sulfide in the biogas. Then it is compressed by a compressor to provide separation power for the membrane purification system, followed by a cooling dehydration and three-stage filtration system to remove moisture and particles in the biogas. When all the indicators of the intake gas meet the design standards of the membrane separation device, it enters the membrane separation device.The device can realize comprehensive testing under different membrane arrangements, different pressures and other working conditions. At the same time, there are backflow, release and drainage systems to ensure the stability and safety of the system.
△Pure physical treatment process, no secondary pollution; △The system can be started and stopped at any time according to needs, with high flexibility;
△Easy to operate and minimal maintenance (regular maintenance is sufficient);
△The system has a high degree of standardization and is easy to scale;
△The product gas can meet the dew point requirements for entering the gas pipeline network;
△The product gas outlet has a strength of 1.1MP-1.5MP, which can be directly sent to the natural gas pipeline network without pressurization;
△Achieving equipment container supply, low footprint and space requirements, and short installation time;
△Wide application range (10Nm³/h-several thousand Nm³/h);
Product Application
△Biogas purification (CNG, input to natural gas pipeline network)
△Landfill gas purification
△Low-quality natural gas purification △CBM purification
Project Case
Chicken farm manure + agricultural straw waste treatment biogas resource utilization for household cooking project (3000m³ anaerobic reactor * 4 + 2000m³ double film biogas holder * 1 set of +15000m³/d biogas purification equipment)
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 21 Mar, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.